[C] TO REDUCE THE PHYSICAL STRAIN OF THE WORK CREW IN WASTE COLLECTION OPERATION

Background

Each public waste collection team requires the use of 2 crew members to perform collection from a mix of bin types on different road conditions.

Collection process may require the crew to push and pull the bins against uneven terrains, up/down slopes, against drains, gutters and kerbs.

Certain routes require waste collection crew to collect from trade premises with 660L bins which are filled to the brim. Such filled bins may weigh as heavy as 300-400kg. Additionally, the crew may need to lift the heavy bins from grass verge/kerbs and bring down to ground level.

  • 2 crew members will have coordinate in the manoeuvring and lifting of the heavy bins. 
  • In certain road conditions, the driver will also have to alight from his cabin to help directing traffic, resulting in delayed collection, prolonged road obstruction and unproductive operations. 
  • Additionally, repeat of such actions daily may result in workplace injuries to the crew overtime.

A proposed solution is required to help in the collection operation without compromising on the operational productivity and safety. Such solution will be used by the waste collection crew and should also be portable, easy to use and safe to operate.

Requirements

The proposed solutions should be meet the following requirements:

  1. Device should help improve the work life of the collection crews 
  2. Device should be easy to operate 
  3. Device should be easily transportable and stored in the truck when travelling from location to location 
  4. Device may be motorised and/or mechanically driven but must not compromise current collection operations. Considerations will be given for device which can improve current operational productivity and safety. 
  5. Cost effectiveness

Desired Outcome

Using an assistive technology to aid in the waste collection crew’s daily operation to collect heavy bins from a variety of road conditions.

Such system should:

  1. Improve productivity and safety of operations 
  2. Improve ease of operations 
  3. Portability of assistive device 
  4. Cost effective solution

Development Timeframe

The target milestones are:

  1. Completion of site evaluation, equipment concept design & detailed drawings 3 months after the start of project 
  2. Completion of working prototype ready for evaluation 6 months after the start of project 
  3. Trial of working prototype with solution adopter for 3 months 
  4. Provide reports and findings on data collated during trial phase 
  5. Completion of full functional end product ready for pilot deployment 12 months after the start of project

Additional Info

Please refer to the attachment for full details on the problem statement.

Please send to [email protected] for any enquiries on this problem statement.

To submit an application, please click on the APPLY button after logging into your user account.

Do remember to attach the application form in your submission.

Challenge

NEA-SPRING JOINT INNOVATION CALL FOR ENVIRONMENTAL SERVICES SOLUTIONS

Proposal submissions are open from 1 Feb 2018 12:00AM to 1 Jun 2018 12:00AM